Service manual
6
6) Plug the electrical control
wires back into the right
side of the PC valve. Turn
the machine back on, and
plug the main air line
back into the pneumatics
panel. Check the
operation of the valve
with the manual actuating
button, and feel/listen for
air leaks when the button
is held down. This button
will either be brass or
black plastic.(see photo)
You may use a pen or
small screwdriver to
actuate the button.
Verify the proper operation of
the new PC valve by cutting a
test mat.
Regulator and Gauge Replacement (part #’s required)
All three of the air gauges
and regulators on the F-
6100 pneumatics panel are
identical, however the air
fittings are different for
each. The regulator/gauge
assemblies are designated
as “Head”, “Clamps”, and
“Auxiliary” from left to right
on the panel. This sample
procedure will refer to the
Head pressure gauge and
regulator, although
replacement for all three is
similar.
Main air gauge and regulator
Black plastic PC actuator button










