Service manual
2
5) Cut the cable tie(s) from the top
area behind the gantry, as
shown. Be careful not to damage
the cables or insulation.
6) Loosen the 5mm Allen bolt which
holds the top end of the cable
carrier channel to the top standoff
block. Do not remove the bolt
entirely, unless the carrier channel
has a hole instead of a slot in this
location.










