Handbook
Table Of Contents
- 1 Introduction
- 2 ClearFill®Star System Description
- 3 System Design Guidelines
- 3.1 CDMA Basics (in preparation)
- 3.2 Required information for system design
- 3.3 Design step by step
- 3.4 Estimated RF Coverage per RRH
- 3.5 Right-sizing - the beacon feature (in preparation)
- 3.6 Capacity demand - number for BSIs (in preparation)
- 3.7 System Architecture
- 4 System Installation
- 4.1 General
- 4.2 System Installation (Hardware Installation)
- 4.3 Installation Radio Remote Head (RRH)
- 4.4 Installation Gigabit Ethernet Switch (GES)
- 4.5 Installation Base Station Interface (BSI)
- 4.6 Installation NMS Server (Hardware)
- 4.7 Commissioning of NMS
- 5 NMS Overview
- 5.1 Introduction
- 5.2 Starting the NMS
- 5.3 Tools and Utilities of NMS server
- 5.4 Main Window of NMS Application Client (structure)
- 5.5 The NMS client functionality
- 5.6 Right Click Menus
- 5.7 RRH Configuration
- 5.8 BSI Configuration
- 6 Configuration Management
- 7 System Supervision
- 8 Remote Management and Supervision
- 9 Operational used cases/Maintenance
- 10 System Specifications and Technical Data
- 11 Conformance Statements
- 11.1 United States
- 11.1.1 Introduction
- 11.1.2 Federal Communications Commission (FCC)
- 11.1.3 FCC Part 15 Class A
- 11.1.4 RF approval
- 11.1.5 IEC product safety conformance
- 11.1.6 Indoor applications
- 11.1.7 Antenna exposure
- 11.1.8 Radiofrequency radiation exposure Information
- 11.1.9 Packaging collection and recovery requirements
- 11.1.10 Recycling / take-back / disposal of products and batteries
- 11.2 Canada
- 11.1 United States
- 12 Appendix
ClearFill Star CDMA
1100187 Rev. 1.0
Page 123 of 152
6.2.4.5 Switch off the BSI.
The BSI is power supplied by the PoE functionality or an external power supply. When it is
supplied over an external power supply the switch off has to be done manually by
disconnecting (or switching off) the external power source.
When the BSI is supplied by the PoE functionality the switch off can be done via the GES.
This is done by following procedure:
Use ClearFill®Star Application Client.
Change to the menu Application->Network Maps->Switches.
Right click on the switch that is supplying the BSI with power.
Click on HTTP device. The browser will open automatically, showing the HTTP menu
of the switch.
Login with:
o Username : admin
o Password: admin
Click in the left hand menu on PoE.
Click in the opening sub menu on PoE Configuration. An overview of all ports of the
GES opens.
Look for port number that is supplying BSI with power.
Select first drop down list in the relating row.
Select Disable.
Click Apply button (bottom of screen), power is turned off now.
Select drop down menu again.
Select Enable.
Click Apply button again, power is turned on, BSI reboots.