Handbook
Table Of Contents
- 1 Introduction
- 2 ClearFill®Star System Description
- 3 System Design Guidelines
- 3.1 CDMA Basics (in preparation)
- 3.2 Required information for system design
- 3.3 Design step by step
- 3.4 Estimated RF Coverage per RRH
- 3.5 Right-sizing - the beacon feature (in preparation)
- 3.6 Capacity demand - number for BSIs (in preparation)
- 3.7 System Architecture
- 4 System Installation
- 4.1 General
- 4.2 System Installation (Hardware Installation)
- 4.3 Installation Radio Remote Head (RRH)
- 4.4 Installation Gigabit Ethernet Switch (GES)
- 4.5 Installation Base Station Interface (BSI)
- 4.6 Installation NMS Server (Hardware)
- 4.7 Commissioning of NMS
- 5 NMS Overview
- 5.1 Introduction
- 5.2 Starting the NMS
- 5.3 Tools and Utilities of NMS server
- 5.4 Main Window of NMS Application Client (structure)
- 5.5 The NMS client functionality
- 5.6 Right Click Menus
- 5.7 RRH Configuration
- 5.8 BSI Configuration
- 6 Configuration Management
- 7 System Supervision
- 8 Remote Management and Supervision
- 9 Operational used cases/Maintenance
- 10 System Specifications and Technical Data
- 11 Conformance Statements
- 11.1 United States
- 11.1.1 Introduction
- 11.1.2 Federal Communications Commission (FCC)
- 11.1.3 FCC Part 15 Class A
- 11.1.4 RF approval
- 11.1.5 IEC product safety conformance
- 11.1.6 Indoor applications
- 11.1.7 Antenna exposure
- 11.1.8 Radiofrequency radiation exposure Information
- 11.1.9 Packaging collection and recovery requirements
- 11.1.10 Recycling / take-back / disposal of products and batteries
- 11.2 Canada
- 11.1 United States
- 12 Appendix
ClearFill Star CDMA
1100187 Rev. 1.0
Page 121 of 152
6.2.2.5 Pilot beacon generation and set-up
The pilot beacon is configured in the RRH Configuration menu. It is described in section
5.6.1.
6.2.2.6 Switching between CELL and PCS band
The switching between CELL and PCS band is done only once during initial sector
configuration. The sector configuration is described in chapter 6.2.1.
To change the band from CELL to PCS or vice versa the sector has to be cleared by using
the template described in section 5.5.3.1.4. Afterwards the sector configuration has to be
redone with updated band values.
6.2.2.7 Assignment to a BTS sector
The Assignment of RRHs to a BSI is done during the sector configuration. The sector
configuration is described in chapter 6.2.1.
To change the relation between RRHs and BSI the sector has to be cleared by using the
template described in section 5.5.3.1.4. Afterwards the sector configuration has to be redone
with updated BTS sector.
6.2.2.8 Beacon
The beacon functionality is configurable within the RRH configuration menu. It is described in
section 5.6.1.
6.2.2.9 Power-off of RRH
The RRH is supplied by the PoE functionality. The switch off can be done via the GES.
This is done by following procedure:
Use ClearFill®Star Application Client.
Change to the menu Application->Network Maps->Switches.
Right click on the switch that is supplying the RRH with power.
Click on HTTP device. The browser will open automatically, showing the HTTP menu
of the switch.
Login with:
o Username : admin
o Password: admin
Click in the left hand menu on PoE.
Click in the opening sub menu on PoE Configuration. An overview of all ports of the
GES opens.
Look for port number that is supplying RRH with power.
Select first drop down list in the relating row.
Select Disable.
Click Apply button (bottom of screen), power is turned off now.
Select drop down menu again.
Select Enable.
Click Apply button again, power is turned on again, RRH reboots.