Specifications
Appendix C Operation, Administration, and Maintenance (OAM) Installation and Operation Manual
C-10 RMON Statistics RICi-4E1/T1, RICi-8E1/T1 Ver. 2.0
The following counters can be monitored:
• Dropped Frames
• Undersize Frames
• Oversize Frames
• Fragmented Frames
• Jabbers
• Frame Loss Ratio
• Frames Above Delay
• Frames Above Delay Variation
• Unavailability Ratio.