Unit installation

Chapter 2 Installation and Setup Installation and Operation Manual
2-2 Equipment Needed FCD-E1
Allow at least 10 cm (4 inches) clearance at the rear of the unit for signal lines
and interface cables.
The ambient operating temperature of FCD-E1 is 0 to 50°C (32 to 122°F), at a
relative humidity of up to 90%, non-condensing.
The FCD-E1 units are cooled by free-air convection, therefore in rack installations
it is necessary to leave sufficient space (at least 1U) above and below each unit, to
enable free airflow.
Electromagnetic Compatibility Considerations
The FCD-E1 is designed to comply with various electromagnetic compatibility
(EMC) standards. To meet these standards, it is necessary to connect the FCD-E1
case to a low-resistance grounding system.
2.3 Package Contents
The FCD-E1 package includes the following items:
FCD-E1 unit
Multiservice Access Devices and Intelligent CLEs CD-ROM
AC power cord or DC power supply connector kit
RM kit (if ordered)
Interface adapter cable(s), in accordance with order (see Connecting the
Synchronous Data Channel on page 2-17).
2.4 Equipment Needed
FCD-E1 is a standalone device intended for tabletop or bench installation. It is
delivered completely assembled. No provision is made for bolting the unit on the
tabletop. For installation of one or two units in a 19-inch rack, refer to the Rack
Mounting Kit for 19-inch Racks guide that comes with the RM kit.
To complete the installation of FCD-E1:
1. Determine the required configuration of FCD-E1, according to your
application and set the internal jumpers and switches accordingly.
2. Connect the E1 sublink, main link, data channels and the CONTROL DCE
port, if necessary.
3. Connect power to the unit.