Unit installation

FCD-E1 Site Requirements and Prerequisites 2-1
Chapter 2
Installation and Setup
2.1 Introduction
This chapter provides instructions for mechanical and electrical installation of the
FCD-E1 unit.
Before performing any internal settings, adjustment, maintenance, or repairs,
first disconnect all the cables from FCD-E1.
No internal settings, adjustment, maintenance, and repairs may be performed
by either the operator or the user; such activities may be performed only by a
skilled technician who is aware of the hazards involved.
Always observe standard safety precautions during installation, operation, and
maintenance of this product.
FCD-E1 units with fiber-optic main link interface may include Class 1 lasers.
For your safety:
Do not look directly into the optical connectors while the FCD-E1 is operating.
Do not attempt to adjust the laser drive current.
The use of optical instruments with this product will increase eye hazard. Laser
power up to 1 mW at 1310 nm and 1550 nm could be collected by an optical
instrument.
Use of controls or adjustment or performing procedures other than those
specified herein may result in hazardous radiation exposure.
ATTENTION: The laser beam is invisible.
Before installing the product, review Handling Energized Products at the beginning
of the manual.
2.2 Site Requirements and Prerequisites
AC-powered FCD-E1 units should be installed within 1.5m (5 feet) of an easily
accessible grounded AC outlet capable of furnishing the required supply voltage
(100 to 240 VAC).
DC-powered FCD-E1 units require a –48 VDC (–40 to –57 VDC) power source.
The power source must be adequately isolated from the mains supply.
Allow at least 90 cm (36 inches) of frontal clearance for operating and
maintenance accessibility.
Warning
Warning
Note