Unit installation

Installation and Operation Manual Quick Start Guide
3
Configuration Procedure
Perform the following actions in the order given below.
Step Action Use the Command
1 Reset the database to the default parameters
INIT DB
2 Define the terminal control codes
DEF TERM
3 Configure the supervisory port
DEF SP
DEF CALL
4 Set FCD-E1 system time and date
TIME
DATE
5 Configure system parameters
DEF SYS
6 Configure the main link parameters
DEF ML
7 Configure the sub link parameters (optional)
DEF SL
8 Configure the data channel parameters
DEF CH 1
DEF CH 2 (when
installed)
9 Define the general system parameters
DEF NAME
DEF NODE
DEF PWD
DEF AGENT
DEF MANAGER LIST
10 Define the alarm handling parameters
DEF AR
DEF ALM MASK
FCD-E1 is now ready for operation.