Unit installation

FCD-E1 Outline of General Configuration Procedure 5-1
Chapter 5
Configuring Typical
Applications
5.1 Configuring the FCD-E1 Application
This chapter provides configuration guidelines for FCD-E1 systems.
The configuration activities presented in this chapter require that the FCD-E1 be
first configured using a standard ASCII terminal, as explained in Chapter 4.
However, after performing the preliminary configuration of the terminal and the
FCD-E1 in accordance with Chapter 4, the same configuration activities can also
be performed by means of a Telnet host, or an SNMP network management
station.
For general information regarding the supervision language syntax, usage and
commands, refer to Chapter 4.
Detailed descriptions of each command appear in Appendix D.
5.2 Outline of General Configuration Procedure
To prepare a typical FCD-E1 system for operation in accordance with customer’s
requirements, perform the following activities in the order given in Table 5-1.
Table 5-1. Outline of Configuration Procedures
Step Activity Reference
1 Perform the preliminary configuration
Chapter 4
2 Define system configuration DEF SYS
3 Configure the FCD-E1 main link
DEF ML
4 Configure each FCD-E1 port and its connections to
the main link
DEF SL
DEF CH1
DEF CH2