Specifications
FCD-E1LC Ver. 1.0 Turning On the Unit 3-1
Chapter 3
Operation
3.1 Turning On the Unit
³ To turn on the unit:
1. Before first-time turn-on, check that the installation and the required cable
connections have been correctly performed in accordance with the
instructions given in
Chapter 2
.
2. Set all the sections on the rear panel E1/T1 LOOPBACK switch to OFF.
3. To enable monitoring the FCD-E1LC during power-up and preliminary
configuration procedures, it is recommended to connect a terminal to the
CONTROL DCE connector of the FCD-E1LC.
Any standard ASCII terminal (dumb terminal or personal computer emulating
an ASCII terminal) equipped with an RS-232 communication interface can be
used to control the FCD-E1LC operation. For best results, use VT-100 terminal
emulation. To monitor the power-up process, configure the terminal for any
rate supported by the FCD-E1LC (1200 to 115200 bps), one start bit, eight
data bits, no parity, and one stop bit. Select the full-duplex mode, echo off,
and disable any type of flow control.
FCD-E1LC does not have a power on/off switch, and therefore it will start
operating as soon as power is applied.
4. Connect power to the FCD-E1LC.
5. The FCD-E1LC PWR indicator turns on; the other indicators turn-on for a start
time, and then turn-off.
6. Wait for the completion of the power-up self-test and initialization. This
takes about one minute.
7. Press <CR> several times in sequence to establish communication with the
FCD-E1LC. The terminal will then display various messages during the
power-up.
A typical display, which notifies you of the results of its power-up self-test is
shown below:
FCD Self Test in Progress ... OK
or
FCD Self Test in Progress ... Failed
In the latter case, you must repair or replace FCD-E1LC before you can
continue using it.
Caution