Specifications

Chapter 2 Installation and Setup Installation and Operation Manual
2-12 Setting the Internal Jumpers and Switches FCD-E1LC Ver. 1.0
Switch
SW2
Figure 2-5. FCD-E1LC, General View After Cover is Removed
³ To check and change internal switch SW2:
1. Refer to
Figure 2-6
and identify the location of the SW2 switch.
In addition to switch SW2 identified in these figures, the FCD-E1LC boards include
additional switches and jumpers that are preset by the manufacturer and must
not be moved.
Note