Specifications

Installation and Operation Manual Appendix D Supervision Terminal Commands
FCD-E1LC Ver. 1.0 Commands D-3
Use
1. To deactivate all the main link loopbacks and tests, type:
CLR LOOP ML<Enter> or CLR LP ML<Enter>
To deactivate a specific main link loopback or test, type:
CLR LOOP LOC ANA ML<Enter> or CLR LP LOC ANA ML<Enter>
CLR LOOP REM ANA ML<Enter> or CLR LP REM ANA ML<Enter>
CLR LOOP LOC DIG ML<Enter> or CLR LP LOC DIG ML<Enter>
CLR LOOP REM DIG ML<Enter> or CLR LP REM DIG ML<Enter>
CLR LOOP BERT ML<Enter> or CLR LP BERT ML<Enter>
CLR LOOP INBAND ML<Enter> or CLR LP INBAND ML<Enter>
2. To deactivate all the sublink loopbacks and tests, type:
CLR LOOP SL<Enter> or CLR LP SL<Enter>
To deactivate a specific sublink loopback or test, type:
CLR LOOP LOC ANA SL<Enter> or CLR LP LOC ANA SL<Enter>
CLR LOOP REM ANA SL<Enter> or CLR LP REM ANA SL<Enter>
CLR LOOP LOC DIG SL<Enter> or CLR LP LOC DIG SL<Enter>
CLR LOOP REM DIG SL<Enter> or CLR LP REM DIG SL<Enter>
3. To deactivate a data channel loopback, type:
CLR LOOP LOC CH 1<Enter> or CLR LP LOC CH 1<Enter>
CLR LOOP LOC CH 2<Enter> or CLR LP LOC CH 2<Enter>
CLR LOOP REM CH 1<Enter> or CLR LP REM CH 1<Enter>
CLR LOOP REM CH 2<Enter> or CLR LP REM CH 2<Enter>
The deactivation of an inband loopback is made by repeatedly transmitting the
deactivation sequence, therefore the loopback can be considered as deactivated
only after approximately 2 seconds.
If no user-initiated loopback of the specified type is now performed, you will
receive
ERROR 052: LOOP IS NOT ACTIVE.
DATE
Purpose
Set the date for the FCD-E1LC internal real-time clock.
The internal clock supports dates up to December 31
st
, 2099.
Syntax
DATE
Note