Specifications
D8E1T1 Installation and Operation Manual Chapter 2 Installation and Operation
Connecting the Cables 2-3
Table 2-1. 50-Pin Connector P1, Pin Functions
Link Pin Function Link Pin Function
26 Transmit tip 38 Transmit tip
1 Transmit ring 13 Transmit ring
27 Receive tip 39 Receive tip
1
2 Receive ring
5
14 Receive ring
29 Transmit tip 41 Transmit tip
4 Transmit ring 16 Transmit ring
30 Receive tip 42 Receive tip
2
5 Receive ring
6
17 Receive ring
32 Transmit tip 44 Transmit tip
7 Transmit ring 19 Transmit ring
33 Receive tip 45 Receive tip
3
8 Receive ring
7
20 Receive ring
35 Transmit tip 47 Transmit tip
10 Transmit ring 22 Transmit ring
36 Receive tip 48 Receive tip
4
11 Receive ring
8
23 Receive ring
Connection Instructions
Before starting, refer to the installation plan to determine the cables intended for
connection to the D8E1T1 module.
• Connect the standard interface cable (CBL-DXC100-D8E1T1/BAL, or cross-
cable CBL-DXC100-D8E1T1/BAL/X, or equivalent) to connector P1 on the
panel of the interface module and each
RJ-45 connector to the user’s equipment.
• When the optional N+1 redundancy function is implemented, connect a
CBL-100PSX-D8E1T1 cable from connector P1 of the module to the
corresponding PSX interface module.
A single screw is used to attach one end of the RJ-48M plug to the module
connector standoffs on the rear interface module.
In order to securely fasten the opposite end of the plug, cable tie mounts have
been provided on the rear interface module. These mounts are located above and
below the RJ-48M connector so that tie-wraps (provided) can be used to securely
hold the plug in the connector:
• The cable tie mount above the connector is used to attach a tie-wrap around
an interface cable (CBL-100PSX-D8E1T1) that feeds down from the
DXC-100PSX N+1 Protection Switch.