Specifications

System Installation
RADring
Installation & Operation Manual
3-2 Installation of RADring Enclosure 3/11/98 12:29
3.2 Unpacking
Before Unpacking
Inspect the equipment container before unpacking. Note and report
evidence of damage immediately.
Unpacking
Procedure
1. Place the container on a clean flat surface, cut all straps and open or
remove top.
2. Remove the RADring carefully and place it securely on a clean surface.
3. Remove all packing material.
4. Inspect the product for damage. Report evidence of damage
immediately.
5. Attach handles to the rack.
3.3 Site Requirements
Power
The RADring unit should be installed within 1.5m (5 feet) of an easily
accessible grounded 115V/230V AC outlet. The power supply accepts
90-260 VAC mains supply.
Front and Rear
Panel Clearance
Allow at least 90 cm (36 inches) of frontal clearance for operator access.
Allow at least 10 cm (4 inches) clearance at the rear of the unit for
management and power cables.
Ambient
Requirements
The ambient operating temperature of the RADring should be within
0-40°C (32-104°F) at a relative humidity of up to 90%, non-condensing.
Caution
Installation, maintenance or repair of the instrument should be carried out
by qualified personnel.