User`s manual

Users Manual 21
cyanoacrylate or contact cement to the inside of the enclosure around each light pipe to hold it in
place.
NOTE: Once the glue is applied, it will not be possible to change the alignment of the
light pipes without damaging the plastic enclosure.
3. Attach the enclosure top to the base.
Position the enclosure top over the plastic enclosure base as shown below in Figure B-3.
Attach the
enclosure top to the base using the two 4-40 × ½ screws supplied. If you installed the light pipes,
be sure they are aligned over the LEDs as shown.
Figure B-3. Attach Enclosure Top
4. Mount plastic enclosure (optional).
Use four #10 screws to attach the assembled plastic enclosure to the surface on which it will be
mounted. This step applies to production versions of RabbitLink boards once development has
been completed.
+
28
28
1
34
2
U2
+
+
+
J11
2
14
3
90
15
65
U3
C35 C36R26 R27
DS1
DS2
DS3
DS4
DS6
DCIN+KVCCOUT2OUT1OUT0 GND IN0 IN1 IN2 IN3 GND
G
N
D
GND
GND
GND
40
DS5
J6
C40
Q1
D5
Q2
D6
Q3
D7
C41
C42
R36 R37
R38
P
W
R
R39
R57
R40
LN
K
1
AC
T1
U
S
ER
LNK
2
A
C
T2
R51
R55
J9
R
54
R
53
R
52
R48
R
49
R
50
R
47
R46
R42
R43
R44
C44
R45
R
6
R
7
C
19
R8
Y3
C28
C29
C30
D3
R20
R
21
R
23
R
25
R
24
R
22
C25
C26 C27
R14
R15
R16
R17
R18
R19
JP1
C24
R13
R12
J5
J7
GNDGND
GND
GND
Y1
C18
C9
R4
C10
C11
C12
J2
C2
C3
R2
C4
J3
R1
J1
EXT BATT
NET GATEWAY
BT1
C5
R3
C6
C7
L1
TVS1
D1
J4
POWER IN
D2
C8
C1
T2
C17
C16
C15
C14
C20
R5
C13
R
9
Y2
T1
C23
C21
R
10
C22
U1
R29
C32
R28
C31
C37
R30
U4
Y4
C
3
9
C33
R
3
2
R35
R
3
4
R
3
3
D4
C34
GND
ATXB ARXB GND TXC RXC 485+ 485- GND
J10
R
5
6
P
R
O
G
O
U
T
IN
P
R
O
G
R31
C38
J8
C
43
R
41
Notched
side