User Manual

LM TMU I&M MANUAL/EN/06.15.2009
29/38
This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret
that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.
Copyright © (2009) R&M Materials Handling, Inc. All rights reserved.
4.3.1 Troubleshooting Worksheet
Table 13. Measure and Record Information
Main hoist power leads L1-L2 Main hoist power leads L2-L3 Main hoist power leads L1-L3
Main hoist power leads L1-Gnd Main hoist power leads L2-Gnd Main hoist power leads L3-Gnd
Inverter Input power leads L1-L2 Inverter Input power leads L2-L3 Inverter Input power leads L1-L3
Inverter Input power leads L1-Gnd Inverter Input power leads L2-Gnd Inverter Input power leads L3-Gnd
Indicate Grounding system:
4
th
conductor of main power
Frame ground
Connected to hardware
None
Indicate Collector System:
Double shoe on each runway conductor
Single shoe on each runway conductor
Indicate Control Transformer Voltage: ____________________ VAC
Indicate Power Supply Size to the equipment:
< 500 KVA
> 500 KVA