Owner`s manual

12
SPECIFICATIONS AND DIMENSIONS (cont.)
Description
Dimension
D1-25 D1-30 D1-36
A. Clearance needed
from bottom of insert to
combustibles or 8" mantel
31" 36" 40"
B. Clearance required
from center of glass to
combustibles
22
1
/
2
" 22
1
/
2
" 22
1
/
2
"
C. Clearance needed from
bottom of insert to 12"
mantel
37" 42" 46"
MINIMUM CLEARANCES TO COMBUSTIBLES
Fig. 12-1 Minimum Clearances
Table 7 - Minimum Clearances to Combustibles
A
B
C
Mantel - 12" Depth
Combustible Trim or Mantel Depth of 8" or less
FRONT VIEW SIDE VIEW
8"
12"
All minimum clearances from surfaces to combustible construction must be met, and maintained at all times. The
clearances shown below include any adjacent walls, spacers, standoffs, and any projections such as shelves,
window sills, or fi replace mantels. Any fi nishing on the mantel must be heat resistant.
A
C
TOOLS REQUIRED
The following are the minimum tools required for the installation of your direct vent insert. Additional tools may
be required for your individual installation.
2 man crew recommended
• rope
• measuring tape
• marker
• appropriate tools for gas supply
and electrical install
• reciprocating saw
hi temp. sealant
• cordless drill
drill bits and drivers
• Phillips screwdriver
5
/
16
" &
7
/
16
" nut drivers
• utility knife
tin snip / hacksaw