Installation Guide
7
Installation Instructions
Pad size and anchoring methods should be chosen to meet wind loading requirements 
in your area. Visit www.qwik.com for the most up-to-date engineering 
documentation or to use our online pad selection tool. 
Inspect Hardware Package Contents:
5010266_REV-E / 1201850001
Locate the ll port cap (corner nearest the product label) and ensure it is 
securely pressed into pad and then tip the pad onto its corner where the plug is 
located. This process should shift the powdered gelling agent contained inside 
the pad towards the ll corner.
Place the QwikPad™ for Condensers on level, compacted ground where 
equipment is to be installed (or on top of existing, level concrete pad). 
Remove ll port cap. Insert garden hose into ll port and ll QwikPad™ for 
Condensers to the top with tap water. 
Do not overfill – Overfilling may result in loss of a portion of the gelling agent. 
Replace ll port cap.
(Required for some installations)
Install ground or concrete anchors 
as determined by your wind loading 
requirements. 
Place the equipment onto the 
QwikPad™ for Condensers  
and center. 
Assemble four (4) condenser unit tie-down assemblies as shown below. 
Insert tie-down assemblies into appropriate pad slots by angling 
bottom retaining washer as shown and dropping into slot. 
Slide tie-down assemblies inward 
toward unit until L-bracket meets up 
with unit. Tighten down ange nut on 
tie-down assembly to secure it to the 
QwikPad™ for Condensers.
Install two (2) self-tapping hex head 
screws through each tie-down assembly 
into base of unit, securing the unit to 
the QwikPad™ for Condensers.
Here, the completed tie-down 
assemblies are shown in-place, 
attached with self-tapping hex 
head screws to the condenser 
unit, which is centered on the 
QwikPad™ for Condensers.
1
2
3
4
5
6
8
9
10
QwikPad™ for Condensers
Ground Anchor (QT8110) Installation: 
 ` Insert anchors into hole located on outer 
edge of pad. 
 ` Using a 1” wrench, turn the anchor 
clockwise while pushing downward on 
top of the anchor. 
 ` Continue driving anchor down until 
anchor head meets the pad. 
Do not over-tighten. 
 ` When using ground anchors, install 
them on opposite sides (See example 
at right). 
 ` NEVER INSTALL AN ANCHOR IN THE 
CENTER HOLE.
Concrete Anchor (QT8111) Installation: 
 ` With pad in place, drill four (4) holes 
in concrete to 1.375” minimum depth, 
centrally located in anchor holes using 
3/16” masonry bit (included in QT8111).     
Center the drill bit in the anchor holes.
 ` Secure pad using four (4) 1/4” x 4” 
concrete anchors with fender washers. 
(included).
QwikPad “L” Bracket (4)
¼”-20 x 4” Carriage Bolt (4)
Builds (4)
Stainless Steel 
Tie-Down 
Assemblies
#10-16 x ¾” Self-tapping, 
Hex Head Screw (8)
¼”-20 Serrated 
Flange Nut (4)
Retaining Washer (4)
QwikProducts® is a registered trademark and QwikPad™ is a trademark of Mainstream Engineering Corporation® Rockledge, Florida 32955, (321) 631-3550, © 2020 Mainstream Engineering Corporation® 
U.S. Patents #10,408,493,#10,559,742 and other Patents Pending
MADE IN THE USA
For more details or information about the  QwikPad™ for Condensers  
visit www.qwik.com/qwikpad4cond/, email info@qwik.com
or call 1-321-631-3550
Tie-down assemblies must be located one (1) per each side of the 
unit or two (2) on two (2) opposing sides of the unit.