Install Instructions

Step 2. Install UV-C bulbs and purier
Install UV-C bulbs
1. Two replaceable UV-C bulbs are shipped with this unit. Carefully
remove bulbs from their packaging.
2. Insert one bulb into each of the two bulb sockets located behind the
front facing plate.
Handle carefully, from the bulb base, and avoid touching the glass.
3. Slide the socket end of each bulb, through the oval opening in the back
plate. Aalign and insert bulb socket pins with the socket pin holes at
the front plate of the unit.
4. Apply rm gentle pressure to ensure full socket connection.
Snap the bulb into the clear bulb retainer clip.
Install Purier
1. This unit ships with one replaceable activated carbon/potassium
permanganate purier (AC/PP).
Locate the purier and remove from its protective package.
2. Remove six screws to permit AC/PP access plate removal, exposing the
purier opening and track.
3. Insert the AC/PP purier into the track and slide all the way to the back
of the unit.
4. Replace the AC/PP access plate and six screws.
NOTE: Purier is packaged separately to prevent
exposure and damage during shipping.
Step 3. Determine the Mounting Location
Ensure the ductwork in the mounting location is deep-
enough to accommodate the length of the unit.
The QwikPure TripleGuardpurier can be mounted horizontally, vertically, or at any
angle in-between. Do not install upside down.
Maximum performance is achieved when the QwikPure TripleGuardis located in the
air plenum just after (downstream of) the air handling unit. This is the supply or post-
evaporator air side of the air handler, not the return air side. This unit does not replace
the traditional air lter located on the return side of the air handler, whose purpose is to
lter out particulate matter and dust.
Because you will be cutting into the supply duct we recommend mounting QwikPure
TripleGuard™ Air Purier in the supply duct, not the sheet metal of the air handler to
avoid any potential damage to components inside the air handler.
When considering a mounting location, consider the power source locationtypically
the power source is the air handler itself. The QwikPure TripleGuardAir Purier can
operate on any AC voltage between 120 and 240 volts. Typically residential AC air
handlers and heat pumps operate on 240 Volts AC and furnaces operate on 120 VAC.
The electrical connection should be performed by a licensed electrician. Fuses are
suppled to provide over-current protection.
When considering a mounting location, remember the AC/PP oxidizing purier is to
be changed annually, so ensure there is ample space to slide the purier out of the
QwikPure TripleGuard™ without any obstructions limiting the travel.
CLEAR
BULB RETAINER CLIP