Installation Sheet
1of2
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
Assembly Instruction Sheet #IS-WHL1717RK
For Style WHL1717RK
Pleasegoto forproductcleaningtips.Gotothe selection.
(4)B10CandelabraBaseBulbs60WMaximum
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
www.quoizel.com Care+Maintenance
LightSource:
EstimatedAssemblyTime:
Preparation:
ToolsRequired: Flathead screwdriver,Phillipsscrewdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Package Contents
A
Crossbar Assembly
x1
Thank you forpurchasing a Quoizelproduct.
Need assistance withparts or assembly?Call Quoizel customerservice at 1-800-645-3184
or visit us on-line at www.quoizel.com
Cage
x1
2017 QuoizelInc.
ReleasedDate:2017-10-11
E
Ceiling Canopy
x1
B
C
Socket Assembly
x1
STEP 1 - Install Ceiling Canopy, Rod, Socket Assembly and Cage
together
A. Thread the Ceiling Canopy (C), the Rod (D) and the Socket
Assembly (B) together and hand tighten until snug.
B. Lift the Cage (E) upward over the Socket Assembly (B) and attach
the side rods to the hangers underside of the Ceiling Canopy (C).
Figure 1
STEP 2 - Installing the Crossbar Assembly
A. Pass the supply wires from outlet box through the Crossbar
Assembly (A). Attach the Crossbar Assembly (A) to the Outlet Box
with the head of the Green Ground Screw facing you. Secure the
Crossbar Assembly (A) with Outlet Box Screws (not included).
Tighten until snug.
Supply Wires with
Ground Wire
Outlet Box Screws
(not included)
Outlet Box
A
Figure 2
STEP 3 Test Fitting Ceiling Canopy to Crossbar Assembly-
A.
eiling canopy to the
ceiling
Remove mounting balls from the Crossbar Assembly (A). Fit the
c and fixture body Crossbar Assembly (A) and
secure with mounting balls. Note: The c should be
snug against the and the mounting balls. If
eiling canopy
not, adjust the
length of the nipple on the Crossbar Assembly (A) by unscrewing
the preassembled hex nut and lock washer and then screwing the
mounting screws in or out of the crossbar until the correct length is
achieved. Once the ceiling canopy and fixture body is secure,
remove the mounting ball and fixture body and proceed to Step 4.
Mounting Screw
Hex Nut and
Lock Washer
Mounting Ball
A
Figure 3
C
B
E
Hanger
Side Rod
Ceiling
Canopy
Rod
x1
D
D