Installation Sheet

1of2
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
Assembly Instruction Sheet #IS-PCGR1617C
For Style PCGR1617C
Pleasegoto forproductcleaningtips.Gotothe selection.
Integrated22WLED.
:LutronDVELV-300P or Lutron SELV-300P.
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
www.quoizel.com Care+Maintenance
LightSource:
CompatibleDimmerSwitches
EstimatedAssemblyTime:
Preparation:
ToolsRequired: Flathead screwdriver,Phillipsscrewdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Thank you forpurchasing a Quoizelproduct.
Need assistance withparts or assembly?Call Quoizel customerservice at 1-800-645-3184
or visit us on-line at www.quoizel.com
2017 QuoizelInc.
ReleasedDate:2017-04-10
Package Contents
A
Crossbar Assembly
x1
C
Fixture Body
x1
STEP 1 - Installing the Crossbar
Assembly
A. Pass the supply wires through the
Crossbar Assembly (A). Attach
the Crossbar Assembly (A) to the
Outlet Box with the head of the
Green Ground Screw facing you.
Secure the Crossbar Assembly (A)
with Outlet Box Screws (not
included). Tighten until snug.
Supply
Wires with
Ground Wire
Outlet Box Screws
(not included)
Outlet
Box
A
Figure 1
STEP 2 Test Fitting Ceiling Canopy to Crossbar Assembly-
A.
eiling canopy to the
ceiling
Remove mounting balls from the Crossbar Assembly (A). Fit the
c and Fixture Body (B) Crossbar Assembly (A)
and secure with mounting balls. Note: The should be
snug against the and the mounting balls. If
ceiling canopy
not, adjust the
length of the nipple on the Crossbar Assembly (A) by unscrewing
Figure 2
STEP 3 - Make Wire Connections
A. Use standard wire connectors (not included) to make all wire
connections. Twist connectors until wires are tightly joined together.
Wrap each connection with approved electrical tape and carefully
stuff all the connected wires into the Outlet Box.
B
D
Ring
x1
Mounting Screw
Hex Nut and
Lock Washer
Mounting Ball
A
Ceiling Canopy
White wire
from outlet box
White wire
from fixture
Black wire from
outlet box (or Red)
Black wire
from fixture
Bare, or Green
Ground wire
from outlet box
Ground wire
from fixture
Bare, or Green
Ground wire
from outlet box
OR
Ground wire
from fixture
Green Ground Screw
on the Crossbar
Figure 3
STEP 4 Install the Fixture-
A. Carefully tuck all wires into the outlet box and position the ceiling
canopy and Fixture Body (B) over the outlet box. Align the holes in
the ceiling canopy with the mounting screws, then attach the ceiling
canopy and Fixture Body (B) using the previously removed
mounting balls. Hand tighten until snug.
Figure 4
Shade
x1
(Step 2 Continued)
the preassembled hex nut and lock washer and then screwing the
mounting screws in or out of the crossbar until the correct length is
achieved. Once the ceiling canopy and Fixture Body (B) is secure,
remove the mounting ball and ceiling canopy and Fixture Body (B)
and proceed to Step 3.
Mounting Screw
Mounting Ball
A
Ceiling Canopy

Summary of content (2 pages)