Installation Sheet

Pleasegoto forproductcleaningtips.Gotothe selection.
(4)A19MediumBaseBulbs100WMaximumor
(4)MediumBaseVintageBulbsarerecommendedbutnotsupplied.
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
www.quoizel.com Care+Maintenance
LightSource:
EstimatedAssembly Time:
Preparation:
ToolsRequired:Flatheadscrewdriver, Phillips screwdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
Note:This CONVERTIBLEfixturecanbemountedaschandelierlightorsemi-flushlight.Refertorespective
installationsteps forinstallations.
Warnings and Cautions
1of4
Assembly Instruction Sheet #IS-BRT1717GK
For Style BRT1717GK
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
2017 QuoizelInc.
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Package Contents
Hardware Contents
AA
BB
CC
DD
Crossbar
x1
Lock Washer
x2
1/4”H
Hex Nut
x2
Nipple
x1
FF
Lock Ball
x1
E
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-800-645-3184
or visit us on-line at www.quoizel.com
Fixture Body
x1
ReleasedDate:2017-02-07
EE
Knurled Nut
x2
II
Canopy
Chain Loop
x1
Canopy Lock
Ring
x1
Ceiling
Canopy
x1
GG
Fixture Chain
x1
HH
Quick Link
x2
JJ
KK
A
Fixture
Loop
x1
B
Nipple
x1
C
Plate
x1
Assembly Instructions for Chandelier Light
(Step 1A - Step 6A)
1/8”H
Hex Nut
x2
D
STEP 1A Install Plate and Fixture Loop-
A. Thread one Knurled Nut (EE) to one end of the Nipple (B) until it is at
least 0.25” from the end. Thread the Lock Ball (FF) onto the end of
the Nipple (B) and hand tighten until snug.
B. Pass the Nipple (B) through the center hole of the ceiling canopy
from the bottom of the ceiling canopy. Thread one 1/8”H Hex Nut (C)
onto the top end of the Nipple (B) to secure the Nipple (B) to the
ceiling canopy.
C. Thread another 1/8”H Hex Nut (C) onto the Nipple (B), which is used
to support the Plate (D). Pass the Plate (D) over the Nipple (B).
Adjust the 1/8”H Hex Nut (C) to make sure the top surface of the
Plate (D) is flush to the top edge of the ceiling canopy.
(Step 1A Continued)
D. Pass the supply wires
and ground wire through
the wire exiting hole on
the Plate (D). Thread
another Knurled Nut (EE)
onto the top end of the
Nipple (B) to secure the
Plate (D). Hand tighten
until snug.
E. Thread the Fixture Loop
(A) onto the top end of
the Nipple (B) and hand
tighten until snug.
Figure 1A
E
A
EE
EE
FF
Ceiling
Canopy
Supply Wires
and Ground Wire
D
C
C
B
STEP 2A Install the Crossbar to the junction box-
.
A. Attach the Crossbar (AA) to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included), tighten until snug
Outlet Box
Outlet Box Screw
(not included)
Green Ground
Screw
AA
Figure 2A
STEP 3A Install the Canopy Chain Loop and Nipple-
A. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at
least 0.25” from the end. Pass one Lock Washer (BB) over the end
of the Nipple (DD) and thread the Canopy Chain Loop (GG) onto
the Nipple (DD). By using pliers, thread the Hex Nut (CC) against
the Canopy Chain Loop (GG) and hand tighten until snug.
B. Thread another Hex Nut (CC) to the middle of the Nipple (DD).
Place another Lock Washer (BB) over the Nipple (DD) and then
thread the Nipple (DD) into the Crossbar (AA) until the Nipple (DD)
is about 0.375” above the Crossbar (AA).

Summary of content (4 pages)