Specification

3.30 MIXING:
Comply with manufacturer’s printed instructions and the following:
A. Material should be mechanically mixed for approximately 3 minutes using a five
gallon (19L) bucket with a ½″ (12 mm) drill and paddle mixer. For large repairs
a standard mortar mixer should be used.
B. Add 1 gallon + 3 pints (5.2L) of clean water for each 60lb (27.2 Kg) bag. Add the
powder to the water and mix to a stiff gel-like consistency. If mix is too firm,
add water sparingly to reach the desired consistency. Do not mix more material
than can be placed in 15 minutes.
C. For repair deeper than 2” (51 mm), up to 30 lbs (13.6 Kg) of clean, high quality ½″ (12 mm)
gravel may be added to the mix per 60-lb (27.2 Kg) bag.
D. Do not re-temper with additional water.
3.40 APPLICATION:
Comply with manufacturer’s printed instructions and the following:
A. Material should be trowel applied to a damp surface.
B. Apply a thin layer with heavy trowel pressure and then build up to the desired
thickness. Material obtains high bond strength without the use of bonding
adhesives or acrylic additives.
C. After initial set, the material may be trimmed and shaped to match the contours
of existing patch area.
D. Do not apply if temperatures are below 40°F (4°C) or are expected to go below 32°
(0°C) within a 24 hour period. Use cold water in hot weather or hot water in cold
weather to achieve desired grout temperature.
3.50 CURING
A. No special procedures are required. During the first 24 hours, keep the patch
covered or damp to prevent excessive loss of water.
3.60 CLEANING
A. Remove excess material before material cures. If material has cured, remove using
mechanical methods that will not damage substrate.
END OF SECTION