Installation Guide
Installation & Owner’s Guide QW-TILE 18
5. Operation Continued
Repair/Remodel Information
Before performing any remodeling work near a heated floor, carefully read Sections 1 through 3 of this manual.
These sections detail the clearances, procedures, and materials involved as well as the testing procedures
required to ensure system safety.
Notes
CAUTION:
This information must be read and understood by all repair
and remodeling technicians who will be working on the house
structure in the area of an installed QuietWarmth
®
Peel & Stick
Radiant Heat or main electrical systems. Failure to follow these
guidelines may result in a risk of electric shock or fire hazard.
CAUTION:
When installing any other materials on
or near a heated floor, ensure that no
heating elements are punctured by nails,
screws, etc.