Installation Guide
Affix to the electrical panel box.
In the space provided, record
the numbers of all circuits to
which floor heating mats are
attached.
QW1015
Affix adjacent to points of
access to all concealed areas
in which installed heating
products are accessible.
QW1009
Affix adjacent to the
thermostat.
QW1011
Complete the Installation
1. Install the finished flooring according to the manufacturer’s instructions.
2. Retest the mats to ensure that the mats have not been damaged during the installation process. If they have
been damaged, follow guidelines noted to remedy the situation.
Place Caution Stickers
Apply warning stickers provided with mats in appropriate locations, as shown below. these labels are an integral
part of this heating system and must be installed for warranty to be in force.
4. Inspection and Testing Continued
Installation & Owner’s Guide QW-FLOAT 16
Install baseboards or trim around the perimeter of the room. This ensures that the
floor will not lift, exposing the mats. The flooring manufacturer’s instructions will have
information about installing the baseboard or trim to allow the floor to float properly.
NOTE: