Installation manual

Operation Manual - Remote Power-feeding
Quidway S3000-EI Series Ethernet Switches Chapter 1
Remote Power-Feeding Configuration
Huawei Technologies Proprietary
1-6
ction of PDs Table 1-7 Enabling/disabling the compatibility dete
Operation Command
Enable the compatibility detection of PDs
undo poe legacy disable
Disable the compatibility detection of PDs
able
poe legacy dis
By default, the compatibility detection of PDs is enabled.
You can use the following command to restore the default PoE configuration on the
1.2.7 Reset the PoE Configuration on the Switch
switch.
Perform the following configuration in user view.
Table 1-8 Reset the PoE Configuration on the Switch
Operation Command
Reset the PoE configuration on the switch reset poe-configuration
1.2.8 Upg
PoE function relie E daughter-card inside the s se this
c da service is
n
he process includes two steps:
1) Download the software of PoE daughter-card to switch Flash.
download the software of PoE
ion reference to FTP and TFTP
segment in “System Management” module of the Operation Manual. Here introduce
Perform the following configurations in system view to upgrade the PoE daughter-card.
Table 1-9 Upgrading the PoE daughter-card by Command
rading the PoE Daughter-Card
s on the Po witch. User can u
ommand to upgrade the application of PoE ughter-card, and the switch
ot interruptive during this process.
T
2) Upgrade the PoE daughter-card by command
User can use FTP, TFTP function of switch to
daughter-card to switch Flash. Detailed descript
step 2.
Operation Command
Upgrading the P -card by Command
poe u
oE daughter
pdate file-url
he extent name of the application file should be “bin”.
T