Instructions / Assembly
Table Of Contents
- QuickJack - Rev. B1 - 5900263 - Sep. 2021 - English
- QuickJack TL Series Manual - English
- Table of Contents
- Introduction
- Shipping
- Safety
- Components
- Accessories
- Specifications
- Frequently Asked Questions
- Setup Checklist
- Setup
- Setup Safety Rules
- Tools
- Selecting a Site
- Unpacking
- Clearances
- Air and Hydraulic Cylinders
- Installing the Hydraulic Elbow Fittings
- About Thread Sealants
- Preparing the Short Hydraulic Hoses
- About Quick-Connect Fittings
- Preparing and Connecting the Long Hydraulic Hoses
- Pressurizing the Air Cylinders
- Find a Location for the Power Unit
- Installing the Hydraulic Fittings on the Power Unit
- Connect the Power Unit to a Power Source
- Filling the Hydraulic Fluid Reservoir on the Power Unit
- Check the Breather Valve
- Bleeding the Hydraulic Cylinders
- Final Checklist Before Operation
- Test the QuickJack
- Leave the Manual with the Owner/Operator
- Operation
- Maintenance
- Troubleshooting
- Wiring Diagrams
- Labels
- Parts Sheets
- Maintenance Log
- Automotive Lift Institute (ALI) Store
- QuickJack - Rev. B1 - 5900263 - Sep. 2021 - French
- QuickJack TL Series Manual - French
- Table des matières
- Introduction
- Expédition
- Sécurité
- Composants
- Accessoires
- Caractéristiques techniques
- Foire aux questions
- Liste de vérification d’installation
- Installation
- Règles de sécurité pour l’installation
- Outils
- Sélectionner un site
- Déballage
- Dégagements
- Vérins pneumatiques et hydrauliques
- Installer les coudes hydrauliques
- À propos des liquides d’étanchéité pour joints filetés
- Préparer les flexibles hydrauliques courts
- À propos des raccords rapides
- Préparer et connecter les flexibles hydrauliques longs
- Mettre les vérins pneumatiques sous pression
- Trouver un emplacement pour le bloc moteur
- Installer les raccords hydrauliques sur le bloc moteur
- Connecter le bloc moteur à une source d’alimentation
- Remplir le réservoir de liquide hydraulique sur le bloc moteur
- Vérifier la soupape de respiration
- Vidanger les vérins hydrauliques
- Liste de vérification finale avant le fonctionnement
- Mettre le QuickJack à l’essai
- Laisser le manuel au propriétaire / à l’opérateur
- Fonctionnement
- Sécurité
- À propos des cales de levage
- Avertissements particuliers concernant le QuickJack
- Positionnement des cales de levage et des cadres
- Levage des cadres QuickJack
- Abaissement des cadres de la première position de verrouillage
- Abaissement des cadres de la position de verrouillage supérieure
- Utilisation du bloc moteur de 12 V c.c.
- Information supplémentaire sur le fonctionnement
- Avertissements concernant le système hydraulique
- Entretien
- Dépannage
- Schémas de câblage
- Schémas de pièces
QuickJack™ Portable Car Jack 29 P/N 5900263 — Rev. B1 — September 2021
Filling the Hydraulic Fluid Reservoir on the Power Unit
The Hydraulic Fluid Reservoir must be filled with Hydraulic Fluid or Automatic Transmission Fluid
before
you begin operation of the QuickJack.
When you receive it, the Fluid Reservoir is empty.
The Power Unit will not work correctly
until it is filled with approved fluids.
The fluid level should be approximately .5 inch (12 mm) below the Fill Hole when the QuickJack is fully
lowered.
⚠ CAUTION If you use the QuickJack
without
fluid in the reservoir, you could damage the
Power Unit.
⚠ WARNING Hydraulic Fluid under pressure is dangerous. You must wear OSHA-approved
(publication 3151) Personal Protective Equipment
at all times
when handling
hydraulic components: eye protection and leather gloves are mandatory.
Approved fluids are any general purpose ISO-32, ISO-46, or ISO-68 Hydraulic Fluid, approved
Automatic Transmission Fluids such as Dexron III, Dexron VI, Mercon V, Mercon LV, or any synthetic
multi-vehicle Automatic Transmission Fluid.
Note: The fluid level drops some after you start using the QuickJack; this is because some fluid
stays in the Hydraulic Hoses. If you notice that the fluid level has dropped more than a little,
you should fill it back up to half an inch below the Fill Hole (with the Frames on the ground).
Important: Do not completely fill the Fluid Reservoir while there is fluid in the hoses. If you do, the
Reservoir could overflow when the fluid in the hoses returns (when you lower the
QuickJack Frames).
QuickJack recommends having a couple of rags nearby in case any fluid leaks.