User Manual
25
QNC CHC
EN
INSTALLATION AND USE MANUAL - REV 001A
2.0 - INSTALLATION
DRILLING TEMPLATE
Fig. 1 Fig. 2
instrument installation continues ➦
• (Fig. 3) Remove the protective paper from the adhesive gasket.
REMOVE THE PROTECTION
FROM THE ADHESIVE GASKET
Fig. 3
WARNING
It is recommended not
to apply the gasket with
temperature below 18°C.
18°
The chain counter meets EMC standards (electromagnetic compatibility). In any case correct installation is fundamental in
order not to affect its performance or interfere with operation of instruments found near it.
For this reason the chain counter must be at least:
• 25 cm from the compass.
• 50 cm from any radio receivers.
• 1 m from any radio transmitters (except for SSB).
• 2 m from any SSB radio transmitters.
• 2 m from the radar beam path.
After selecting the instrument position, follow the steps given below:
•
Fix the drilling template sheet onto the surface using adhesive tape.
• (Fig. 1) drill 4 holes for the bushes using a Ø 11.5 mm bit.
• (Fig. 2) prepare the central opening with a suitable tool following the indications on the template.
• Remove the template and any cutting burrs present at the holes.
WARNING: an inaccurate cut can compromise the tightness of the gasket between instrument and panel.
2.4 - Instrument installation