Universal Tile Mount - Single Manual

You are now ready to proceed with your
top tile ashing installation (steps 7-8 on
page 2).
Digital installation instructions are also
available at our website:
www.quickmountpv.com/support/
downloads.html
For more information on tile roong best
practices and code compliance visit the
Tile Roof Institute's website:
www.tileroong.org
Gather materials needed.
2
3
1
Subflashing Waterproofing Method: Three-Course
Clean away dust and debris around QBase. Apply a bead of sealant in the shape of an upside
down U on the back side of the subashing.
Install the subashing over the post, making sure
the edge closest to the cone is on the downhill
side.
6
7
4
Apply 1/8" thick layer of roong cement around the
top and sides of the subashing with at least 1" ex-
tending past the sides of the ashing onto the felt.
Layer should be about the thickness of a nickel.
While cement is still wet apply 3 pieces of rein-
forcing fabric strips where felt paper and ashing
meet – a 14" strip along the top, and a 10" strip
along each side.
5
Fasten the subashing into place with two roong
nails, one in each top corner.
Installation Tools Required: gloves, hammer, brush, roong nails, roong cement, trowel, roll of reinforcing fabric, sealant compatible
with roong material
8
After rst layer of cement is dry apply second layer
over reinforcing fabric to nish waterproong of
subashing.
Oct-2013, Rev 6
BI 7.2.3-4
2 of 4 3 of 4