QMLSH Tilt Mount Standoff - Single Manual

Jun-2015, Rev 5
925-478-8269 www.quickmountpv.com info@quickmountpv.com
2700 Mitchell Dr., Bldg 2 Walnut Creek, CA 94598
QBase Low Slope Mount Instructions
Installation Tools Required: Drill with 7/32'' bit, impact gun with 1/2'' socket, 1 tube of sealant compatible with roo ng materials,
pencil, chalk line
BI 7.2.3-5
Locate the desired mount placement over a rafter (or cus-
tom wood blocking). Using the base as a template, mark
the two penetration points with either a pen or light drill-
ing. Use two opposing holes on the base plate, parallel to
the structural member.
Drill both pilot holes with a 7/32-inch bit. Make sure to
hold the drill square to the rafter. The lag bolts must be an-
chored into a structural member, so it is very important to
hit the center of the rafter with your pilot holes. Fill the pi-
lot holes with a sealant compatible with roo ng materials.
Prior to attaching the base to the roof, place the grade-8
hex bolt (item 1) in the bottom of the base (item 2) and
screw the post (item 4) in. This is easier than adding the
post after securing the base to the roof. Attach the base/
post assembly to the roof with two lag bolts (item 3).
Attach the hardware (items 5-8) to the top of the post. (Be
sure to seal off the post from weather exposure with the
sealing washer (item 5), in the interim before racks are in-
stalled.) You are now ready to  ash the mount, roof around
it, and attach racking. Aluminum  ashings for built-up
roofs are available from Quick Mount PV in 4" and 8" cones
(sold separately). For membrane roofs, be sure to use man-
ufacturer-speci ed  ashing and utilize the services of a
certi ed roofer.
WARNING: Quick Mount PV products are NOT designed and should NOT be used to anchor fall protection equipment.
©2015 by Quick Mount PV. All rights reserved.