Installation Manual
BI 7.2.3-44
June 2018, Rev 4
4 5
Not Included Due to Site Specic Needs:
• Strain relief ttings for PV homerun wires for sidewall pass-through.
• Conduit connectors and ttings for transition wiring for sidewall pass-through.
• #8 - #12 AWG, min 90° C copper wire as required by NEC.
• #6 - #10 AWG bare copper roof ground wire as required by NEC.
• Approved wire connectors.
• 3/4" EMT tting to transition from QBox 3/4" EMT conduit nipple to attic building wire.
• Lug nut.