Installation Manual

BI 7.2.3-44
June 2018, Rev 4
4 5
Not Included Due to Site Specic Needs:
Strain relief ttings for PV homerun wires for sidewall pass-through.
Conduit connectors and ttings for transition wiring for sidewall pass-through.
#8 - #12 AWG, min 90° C copper wire as required by NEC.
#6 - #10 AWG bare copper roof ground wire as required by NEC.
Approved wire connectors.
3/4" EMT tting to transition from QBox 3/4" EMT conduit nipple to attic building wire.
Lug nut.