Installation Guide
BI 7.2.3-40 Jan-2020, Rev 13
Locate and remove the tile that will be replaced by
the tile replacement flashing. Remove tile to the le
of and above the mount location. Locate raer and
mark center. Measure 8" up from bottom of the
adjacent tiles and mark the location with a horizontal
line across raer.
2
3
1
Align the base plate over raer so the lag holes line
up with the raer line and horizontal line aligns with
the post groove. The orientation of the base plate can
be flipped east-west for post location versatility of up
to 12". Mark location of lag holes on the roof.
Drill two pilot holes using " bit to a depth of 2".
Be sure lags go into center of raer for strongest
attachment. Pilot holes reduce raer splitting. Fill
pilot holes with appropriate sealant and align lag holes
over the pilot holes.
Waterproof at underlayment level according to
roofing manufacturer instructions and Tile Roofing
Institute Guidelines. Alternative flashing methods
may be approved by the AHJ at their discretion.
6
7
4
Insert the grade-8 serrated flange bolt into the bottom
of the post. Slide post into base plate channel. Line
up post with the hole in the tile replacement flashing.
Leave loose for adjustments.
Place the tile replacement flashing over the post
and mount, allowing flashing to interlock with
surrounding tiles properly. Secure the post by
tightening it down using a pair of channel lock pliers.
Replace surrounding tiles.
5
Use T-30 Torx bit and impact gun to secure mount into
raer with provided hardware.
Instructions: QMTR - Tile Replacement Mount
Installation Tools Required: stud finder, tape measure, utility knife, drill with " bit, impact gun with T-30 Torx bit, channel lock pliers,
caulking gun, appropriate sealant compatible with EPDM rubber and roofing materials, roofing bar, and hand broom.
NOTE: Installation method is the same for all tile replacement flashing profiles.
1
WARNING: Quick Mount PV products
are NOT designed and should NOT
be used for anchoring fall protection
equipment.
CAUTION: Prior to installation, check
that proper screw embedment will
be achieved for the necessary site
load and roofing configurations.
8
Apply a bead of sealant where the post meets the
flashing. Slip the EPDM collar over the post and onto
the flashing.