End caps are installed either by simply inserting them into the ends of
the rails. See Images 5.6.1-1 & 2.
5.4 End Caps
At this point, it is recommended to install the rail at the opposite side of the array and level it at both ends with respect
to the first rail. That is, if the lower-most rail was installed first, the uppermost rail should be installed second and
leveled N-S with the first rail and E-W.
Stretch strings from each corner of the upper and lower rails.
Position the next rail and attach it as described above, leveling it both E-W and N-S using the strings installed above as
reference.
Repeat the above steps for each rail in the array.