QRail Installation
BI 7.2.3-46
Jul-2019, Rev 4.2
BI 7.2.3-46
Jul-2019, Rev 4.2
22
INCORRECT CORRECT
Array Installation:
A er determining the location of the array on the roof, mark the location of the lower rail with a chalk line or other
suitable method.
Determine the ra er locations and mark them on the E-W chalk lines.
Install the roof attachments along the chalk line per the manufacturers’ instructions taking care to align the L-foot
mounting point (mount bolt) as closely as possible to the intersection of the ra er and the chalk line.
Install and tighten the L-feet on the two end mounting/ flashings taking
care to place the upright stays of the L-feet as closely aligned with the
marked line as possible with the faces of the stays as closely parallel to the
line as possible.
Stretch a reference string between the end L-feet and attach the remaining
L-feet with the upright stays just touching the reference string and secure
them in position.
Using the gauge fabricated earlier or using a measuring tape or other
suitable method, locate and mark the positions of the remaining rows of
the array.
Install the remaining mounting/ flashings and L-feet and check frequently
to ensure proper N-S spacing of the upright surfaces of the L-feet stays
with the distance gauge.
Position the rail in place E-W and hold each end of the rail against the end
L-feet. Insert the preassembled T-head rail fasteners in the end L-feet into
the slot on the side of the QRail rail. Using a spirit level or other suitable
device, set and hold the rail level at the desired height by moving the
T-head bolt up or down in the L-foot. See Image 5.3.4.
Using a 13 mm socket, tighten the rail fastener nuts to 16 -lbf (22 N-m). (Be
sure to allow the bolt head to rotate as far as possible in the T-head channel
to ensure full engagement of the bolt head with the sides of the channel).
Full engagement is confirmed when the alignment line on the end of
the T-bolt is vertical. See Image 5.3.5.
With each end of the rail secured and the rail level, proceed along the line of L-feet, inserting the T-head bolts into the
rail side channel and tightening as above.
Optional gauge fabrication:
Fabricate an installation gauge by laying two rails on a flat
surface. Lay one of the modules on the rails as shown. Be sure
the rails are parallel with the edges of the module and with each
other.
Carefully measure distance “a” as shown in Image 5.3.3. This is
the critical N-S distance between L-foot rail attachment points for
shared rails. Carefully cut a dowel, PVC pipe, or other rigid length
of material to distance “a.”
Installing Shared QRail Configuration
Image 5.3.3
Shared rail distance gauge
Image 5.3.4
a
Image 5.3.5
1
If using non-nylon patched t-bolts tighten to 15 -lbf (20 N-m)