QRail Installation

BI 7.2.3-46
Jul-2019, Rev 4.2
BI 7.2.3-46
Jul-2019, Rev 4.2
20
Internal Splice:
Install the internal splice 1" of gap between the rails.
A er installing the rails install the WEEB-BNDJMP8.0 across
the gap with T-bolts. Insure a loop is le to allow for thermal
expansion and contraction and torque T-bolts to 16  -lbs
1
.
Thermal Break
In cases where a thermal break is necessary it is recommended
to use the splices in conjunction with the Wiley WEEB-
BNDJMP8.0 to insure continuous bonding across the thermal
break.
CAUTION
Modules cannot be installed over
thermal break. The row of continuous
modules must end before the break
and a new row must start a er the
thermal break.
External Splice:
Install the external splice while leaving a gap of 1" between
rails. Tighten only ONE bolt on the splice to allow for thermal
expansion and contraction.
A er installing the rails install the WEEB-BNDJMP8.0 on the
opposite side across the gap with T-bolts. Insure a loop is le
to allow for thermal expansion and contraction and torque
T-bolts to 16  -lbs
1
.
Images 5.2.12
WEEB-BNDJMP8.0 installed with Internal QSplice
Images 5.2.11
1" thermal break with Internal QSplice
Images 5.2.13
1" thermal break with External QSplice
Images 5.2.14
Tighten only ONE bolt on the splice
Images 5.2.15
WEEB-BNDJMP8.0 installed with External QSplice
NOTE!
Align module a minimum of 1.2” from the end
of the rail.
1
If using non-nylon patched t-bolts tighten to 15  -lbf (20 N-m)