QMCC A Installation Guide
Using drill with 3/16" long bit, drill pilot hole into 
roof and rafter, taking care to drill square to the 
roof.
Clean o any sawdust, and ll hole with roof 
manufacturer's approved sealant.
Lift shingle and slide conduit mount into place. 
Prepare lag bolt with sealing washer and single hole 
clamp (not included) as shown. Insert lag through 
hole in block, and position clamp over conduit. 
2
3
5
4
6
7
1
925-478-8269 www.quickmountpv.com info@quickmountpv.com
2700 Mitchell Dr., Bldg 2 Walnut Creek, CA 94598
Classic Conduit Mounting Instructions
Installation Tools Required: tape measure, roong bar, chalk line, stud nder, caulking gun, 1 tube of appropriate sealant, drill with 
1/8" bit, drill or impact gun with7/16" deep socket.
Choose placement of conduit mounts along path 
of conduit. Select location over center of rafter.
Lift composition roof tile with roong bar, just 
above placement of conduit mount. 
Slide conduit mount into desired position. Remove 
any nails that conict with getting the mount ush 
with front edge of shingle course. Mark cernter for 
drilling.
Oct-2013, Rev 4BI 7.2.3-8
WARNING: Quick Mount PV products are NOT designed for and should NOT be used to anchor fall protection equipment.
Insert lag through hole in block, and position 
clamp over conduit. Using drill with 7/16" socket, 
drive lag until block is tight. 
All roong manufacturers’ writ-
ten instructions must also be 
followed by anyone modifying a 
roof system. Please consult the 
roof manufacturer's specs and 
instructions prior to touching 
the roof.