QMCC A Installation Guide

Using drill with 3/16" long bit, drill pilot hole into
roof and rafter, taking care to drill square to the
roof.
Clean o any sawdust, and ll hole with roof
manufacturer's approved sealant.
Lift shingle and slide conduit mount into place.
Prepare lag bolt with sealing washer and single hole
clamp (not included) as shown. Insert lag through
hole in block, and position clamp over conduit.
2
3
5
4
6
7
1
925-478-8269 www.quickmountpv.com info@quickmountpv.com
2700 Mitchell Dr., Bldg 2 Walnut Creek, CA 94598
Classic Conduit Mounting Instructions
Installation Tools Required: tape measure, roong bar, chalk line, stud nder, caulking gun, 1 tube of appropriate sealant, drill with
1/8" bit, drill or impact gun with7/16" deep socket.
Choose placement of conduit mounts along path
of conduit. Select location over center of rafter.
Lift composition roof tile with roong bar, just
above placement of conduit mount.
Slide conduit mount into desired position. Remove
any nails that conict with getting the mount ush
with front edge of shingle course. Mark cernter for
drilling.
Oct-2013, Rev 4BI 7.2.3-8
WARNING: Quick Mount PV products are NOT designed for and should NOT be used to anchor fall protection equipment.
Insert lag through hole in block, and position
clamp over conduit. Using drill with 7/16" socket,
drive lag until block is tight.
All roong manufacturers writ-
ten instructions must also be
followed by anyone modifying a
roof system. Please consult the
roof manufacturer's specs and
instructions prior to touching
the roof.
©2013 by Quick Mount PV. All rights reserved.