Low Slope Roofs Flashing Guidelines

Jan-2017, Rev 3BI 7.2.3-5_1
925-478-8269 | www.quickmountpv.com | info@quickmountpv.com
2700 Mitchell Dr. | Walnut Creek, CA 94598
Soprema ALSAN Flashing Installation Instructions
Find more information at www.soprema.us.
Clear away all debris around the mount. Apply roof compatible sealant in a
square around the mount where the
flashing will be placed.
Apply a base coat of ALSAN over the
flashing, overlapping the edge of the
flashing by at least 4".
Apply a bead of EPDM approved
sealant where flashing meets post
and install EPDM counter flashing
collar.
Embed four pieces of fleece fabric scrim
around the flashing, overlapping the
edge of the flashing by 4".
Add additional ALSAN flashing between
layers where fleece skrim overlaps.
Place flashing over mount and nail
down at each corner of the flashing.
Scu up the surface of the flashing with
sandpaper.
Apply a thin top coat of ALSAN flashing
over entire fleeced area. Let dry for four
hours.