Technical data

BACnet/IP Controller 750-830 91
Programming the PFC Using WAGO-I/O-PRO CAA
WAGO-I/O-SYSTEM 750
BACnet/IP Controller
3.1.8 Programming the PFC Using WAGO-I/O-PRO CAA
Using IEC 61131-3 programming, the 750-830 BACnet/IP Controller can also
utilize the function of a PLC in addition to the functions of a fieldbus coupler.
Creation of an application program in line with IEC 61131-3 is performed us-
ing the programming tool WAGO-I/O-PRO CAA.
Note
IEC 61131-3 programming of the controller via ETHERNET requires that the
check box "CoDeSys" be activated at the Website "Port Configuration" (see
Section 1.1.8.7).
You can, however, also connect the client PC and controller serially for pro-
gramming using a programming cable.
A description of programming using WAGO-I/O-PRO CAA is not included in
this manual. The following sections, on the other hand, contain important in-
formation about creating projects in WAGO-I/O-PRO CAA and about special
modules that you can use explicitly for programming of BACnet/IP controller.
Explanations are also provided as to how the IEC 61131-3 program is trans-
ferred and how suitable communication drivers are loaded.
Additional Information
For a detailed description of using the software, refer to the manual for the
"WAGO-I/O-PRO CAA". This manual is located at http://www.wago.com
under: Documentation ! WAGO-I/O-SYSTEM759 ! WAGO-I/O-PRO !
759-333
1. Start the programming tool at Start \ Programs \ WAGO-I/O-PRO and
WAGO-I/O-PRO CAA.
A dialog window then appears on which you can set the target system for pro-
gramming.
Fig. 3-4: Dialog window for target system settings g083005e
2. Select the WAGO 750-830 BACnet/IP Controller by entering
WAGO_750-830 and then click OK.
3. Create a new project under File / New.
4. In the dialog window that appears select the program type (AWL, KOP,
FUP, AS, ST or CFC).