User`s guide
Airborne Control Center
100-8006-152G AirborneDirect™ Serial Bridge User’s Guide Page 57
Quatech, Inc. Confidential
Restarting the Bridge
When you click the Restart button, you will see the Warning displayed in XXFigure 20XX. Click Yes to
complete the Bridge restart or No to stop the process and return to the Reset Page.
Figure 27. Confirm Restart
XXFigure 21XX will be displayed after you have clicked Yes. Click OK to dismiss this informational
dialog. Once the restart has been completed, the ACC will display the Status Page.
Figure 28. Reset In Progress
Note:
If the Status Page does not reappear, click the Status link on the
navigation bar. If it still does not reappear, determine whether the Bridge’s
IP address changed. If it did, click the Login link on the navigation bar and
log in to the Bridge again. Otherwise, try the Bridge’s old IP address again.
The ACC may timeout before the Bridge can obtain its DHCP lease.