Installation Guide
5
1.
2.
3.
Box out detail showing suggested
dimensions.
After removing box formwork connect
shower channel to plumbing pipe work.
Shower channel tted in place prior to
nal concrete slurry pour. Shower channel
ange should be at same level as original
concrete slab.
1. Where alterations to oor joists are
necessary, consult Structural Engineer for
advice and reinforce oor joists as advised.
2. Frame out shower surround as required.
3. Connect base of ange outlet adaptor to
pipe work, leaving drain bolts in place. Block
drain opening with rag to prevent oor mortar
from blocking pipe work.
4. Trowel mortar onto sub-oor .
5. Install CPE membrane , reinforce around
outlet and cut carefully to reveal heads of
drain bolts and outlet.
6. Install top section of ange outlet adaptor .
7. Test membrane for leaks.
8. Lubricate outlet spigot on shower channel
(liquid soap) and push t shower channel into
outlet at correct position and height.
9. Cut plastic installation feet to height to rest
on the membrane and keep shower channel
at required height and level.
10. Trowel mortar to required height , allowing
for thickness of tile and thin set mortar and
grade to create 2% slope towards the drain.
11. After oor mortar has cured, apply thin set
and install tile and grout .
12. Install grate into shower channel.
G
Stainless steel
channel
Height adjustable leveling feet
Stainless steel
grate
Liquid membrane
(supplied by others)
Membrane clamp
2pc Drain Flange (PVC or cast iron)
Compression fit gasket
Waterproof membrane
(supplied by others)
Flange body
G