User`s guide
Chapter 6 Maintaining Your Library
Maintenance Actions
Scalar i6000 User’s Guide 458
Running the Verification Tests 6
This section provides instructions for starting the installation verification
test, partial tests, and FRU operational tests.
To stop a test, disable the robotics by pressing the Robotics Enable button
on the operator panel or by clicking Stop on the Verification Tests dialog
box. Control will be returned to you as soon as the current command is
completed.
The test results appear after the tests complete. The different reports
(Library Report, Drive Report, and Blade Report) will be generated and
viewable in the Reports area of the Verification Tests dialog box.
If a typical user logs on while an administrator is logged on and running
a verification test, testing will continue unaffected. Only one administrator
can be logged on at any given time.
Installation Verification Test 6
When the installation verification test is running, no one else can log on to
the library. The message, "Verification Test is Running," appears in the
Activity area of the main LMC display.
1 Log on as an administrator.
2 Make sure that you are viewing the physical library. From the View
menu, click the name of the physical library.
3 Click Tools > Verification Tests.