Chapter 6 Maintaining Your Library
Maintenance Actions
Scalar i6000 User’s Guide 431
Full system tests or individual field replaceable unit (FRU) tests
Logs of installation and configuration tests
Graphical reports showing passed, marginal, and failed results
No affect to integrity of data
To perform these tests, the accessor assembly must be ready and
fu
nctional, and the library must be powered on. In addition, the library
must be in an offline state, and at least one scratch tape must be inserted
in the I/E station.
Test Descriptions
6
This section describes the verification tests that are available.
Installation Verification Test
6
The installation verification test enables
you to verify that the library’s
installation and configuration is complete and functioning correctly. The
installation verification test runs the following individual tests:
Library alignment test
Picker assembly test
I/E station assembly test
•Get/Put test
Scanner fiducial test
The smaller library configuration will require about 1 hour and the larger
configurations will re
quire as long as 6 hours to run the installation
verification test. The time to complete individual tests on an eight-frame
configuration is approximately:
Library alignment test - 30 minutes
Picker assembly test - 1 minute
I/E station assembly test - 5 minutes
for each 24 slot I/E station
Get/Put test - 120 minutes
Scanner fiducial test
- 75 minutes
These times do not include debug or repair time.