User`s guide
Chapter 5 Running Your Library
Powering On the Library
Scalar i6000 User’s Guide 318
Powering On the Library
1 Make sure that you wait 5 minutes after powering off the library
before you power it on.
Waiting 5 minutes is important because the
power supply discharges for several seconds after
you power off the library. If you attempt to power
on the library too soon, the power supply will
fault.
2 On the power distribution unit(s), set the circuit breaker switch to the
up (I) position.
3 To turn on
power to the library, press the Power button on the
indicator panel.
The library begins to boot up. Within five minutes, the LMC display
appears on the library’
s touch screen. A library with only a few
drives usually will be fully powered on and ready for use within 10
minutes. However, if a library is large with a high number of drives,
it can take more than an hour for the library to fully power on,
complete its discovery process, and become ready for use. During the
power-on process, the Robotics Enabled indicator flashes. When the
library is fully up and ready to receive commands, the Robotics
Enabled indicator turns solid green.
Locking/Unlocking the I/E Station
The Scalar i6000 I/E stations have multiple open and close sensors. When
you are finished accessing the I/E station, make sure the station door is
fully closed.
There are two reasons the I/E station door locks:
CAUTION