User`s guide
Table Of Contents
- Contents
- Tables
- Figures
- Preface
- Introduction
- Installation
- Operation
- Functional Description
- Best Practices
- Frequently Asked Questions

Chapter 3 Operation
Creating a Protection Plan
GoVault™ Data Protection Software, Version 1.0 User’s Guide 38
• If the computer has not been idle that long, retry for up to 1-
999 minutes
• Stop the task if the computer ceases to be idle
• Power Management options:
• Don’t start the task if the computer is running on batteries
• Stop the task if battery mode begins
• Wake the computer to run the task
10 Click
OK to save your advanced scheduling tasks and close the
Scheduled Task dialog.
Figure 28 Scheduled Task
Settings Tab