User`s guide
Table Of Contents
- Contents
- Tables
- Figures
- Preface
- Introduction
- Installation
- Operation
- Functional Description
- Best Practices
- Frequently Asked Questions

Chapter 3 Operation
Creating a Protection Plan
GoVault™ Data Protection Software, Version 1.0 User’s Guide 37
Figure 27 Advanced Schedule
Options Dialog
6 As required, use the option buttons and selection boxes on the
Advanced Schedule Options dialog to specify:
•Start Date
•End Date
• Repeat Task:
•
Every 1 to 9,999 minutes or seconds
•
Until either a specified Time, or a specified Duration of from 1
to 9,999 hours or 1 to 99 minutes
•The
If the task is still running . . . option
7 Click
OK to close the Advanced Schedule Options dialog and return to
the Windows
Scheduled Task dialog.
8 Click the
Settings tab of the Scheduled Task dialog to specify the
advanced scheduling task options for your protection plan (see
figure 28
).
9 As required, use the check boxes and selection boxes on the
Selections tab to specify:
•
Selected Task Completed options:
• Delete the task if it is not scheduled to run again
• Stop the task if it runs for 1 to 999 hours, 1 to 99 minutes
•
Idle Time options:
• Only start the task if the computer has been idle for at least 1-
999 minutes