User's Guide

Appendix B Relocating the Library
Preparing the Library for Operation
Quantum PX720 User’s Guide 209
Preparing the Library for Operation
After shipping or moving the library, refer to the Quantum PX720 Pre-
Installation Site Survey Instructions and the Quantum PX720 Unpacking
Instructions to:
Prepare the new installation site
Receive the library
Uncrate the library (required in shipping the library)
Position the library
Prepare the library for operation