Instruction Manual
ATL P1000 Series Library Unpacking Instructions
Document 6221100-02, Ver. 2, Rel. 0
March 1999
8 Unpacking the Library
Unpacking the Library
5
The P1000 unpacking procedure consists of the following steps:
‡ receiving the library from the shipper (see “Unloading Space
Requirements” on page 9)
‡ uncrating the library (see “Uncrating the Library” on page 10)
‡ installing the slide assembly in the rack (rack-mount library only)
(see “Installing the Slide Assembly in the Rack” on page 13)
‡ removing the library from the pallet (see “Removing the Library
from the Pallet” on page 22)
‡ removing the internal packing materials from the library (see
“Removing the Internal Packing Materials” on page 28)
The following sections detail each of these steps.
Note: Before performing the procedures in the following sections, make sure
the site you have chosen for the installation meets the requirements
listed in “Selecting an Installation Location” on page 5.