User's Manual
Chapter 2 Installing the Internal SCSI Tape Drive
Confirming the Installation
DLT-V4 Product Manual 15
Confirming the Installation 2
When you turn on power to the tape drive, it performs its power-on self-
test. The LEDs on the front panel of the tape drive illuminate in a specific
sequence (see Power-On Self-Test (POST) Indicator Activity
on page 51
for details).