Installation Guide

DRAFT DGA-LT1 Installation Guide
5
MonitorInstallation
CAUTION:DonotattempttoinstallyourDGALT1OnLineTransformerMonitoruntilyouhavereadandfully
understandtheproceduresoutlinedinthisdocument.
InstallationoftheDGALT1consistsofthefollowing:
SitePreparation
MountingtheMonitor
MountingtheGateway
BleedingAirfromthe
Monitor
Configuration
SitePreparation
NOTE:Qualitrolrecommendsaminimumsizeof1”forthetransformeroilsupplyvalveandaminimumof3”vertical
clearancebetweenthevalvecenterlineandthetransformerfoundationforproperinstallationspace.
Ensurethefollowingpriortomountingthemonitor:
AnadequatevalvelocationformountingtheDGA
LT1monitorhasbeenidentified
TransformerisoilfilledandabaselineDissolvedGasAnalyzersamplehasbeentakentoprovide
baselinelevelsforHydrogenconcentrationandOxygenconcentrationforuseinconfigurationofthe
system
Allshippeditemshavebeenlocated
ThefollowingtoolsarerequiredforinstallationoftheDGALT1monitor:
Adjustablewrenchand/orpipewrench
Teflontapeandpipethreadsealant
Containertocollectoilduringinstallation
Notethatinstallationofthesensorsandgatewayshouldtakeplace
fromtransformerclosesttothecellular
gatewaylocationoutwardstoensurethatacommunicationpathhasbeenestablishedforcommissioningof
eachsensor.