Instruction Manual
Guardian Fall Protection 6305 S. 231st St., Kent, WA 98032 phone: (800) 466-6385 fax: (800) 670-7892 www.guardianfall.com
14
See the following images of a fully installed Stacker Bracket System (without a run termination):
17. Install End Rails at all system run termination points. Bottom of End Rail connects to
Guardrail Post below the middle rung. Insert top of End Rail fully into top of Guardrail Post.
See the following image of a fully installed Stacker Bracket System (with a run termination
requiring an End Rail):